case study: Rushmoor Borough Council
New server room reduces flood risk Nick Harding, Head of IT, Rushmoor Borough Council
Challenge Solution All equipment was moved out, moved back and, in some cases, upgraded. New walls – water proof and 90 minutes fire rated (60 minutes approved) – were fitted and lined and sealed with a made-to-measure butyl liner laid over a felt. All wall panels were resin sealed to the concrete floor. The new build also included a secure door to the office, a raised floor, new server cabinets, air conditioning, environmental monitoring, uninterruptable power supply, green fire suppression solution and shutdown and callout system. The environmental systems provide monitoring of the room such that key staff are advised by text alerts in the event of fire, excessive temperature, water leaks and failure of key systems such as UPS, generator and air conditioning. And, an automatic, controlled shut down is activated in the event of fire or over-temperature conditions. Benefits London
Manchester
Brighton
Leeds
Bristol
Liverpool
Nottingham
Birmingham
Newcastle
© 2012 Comms Room Services Limited
Registered Office: 167-169 Great Portland Street, London, W1W 5PF
Registered in England, Number 4356154
|