case study: Hounslow Borough Council
New server room enhances Council's service delivery Andrew Grogan, Infrastructure and Networks Manager, Hounslow Borough Council Challenge Solution The server room and infrastructure was rebuilt over a period of four months. The raised floor was replaced and new structured cabling installed. The power infrastructure (UPS and generator set) and air conditioning systems were upgraded – both utilising N+1 solutions for added redundancy and guaranteed uptime. A green gas fire suppression system was introduced and the access control and CCTV system replaced and upgraded. In the event of fire, the environmental monitoring systems are designed to initiate a controlled shutdown and send situation updates to key staff via text alerts. And, very importantly, the build was executed in a live environment. Most of the data cabinets were moved over weekends in a series of controlled outages. Some cabinets could not be moved, so were lifted while still live and work continued underneath. Old partition walls were replaced with a secure fire-rated structure. Benefits London
Manchester
Brighton
Leeds
Bristol
Liverpool
Nottingham
Birmingham
Newcastle
© 2012 Comms Room Services Limited
Registered Office: 167-169 Great Portland Street, London, W1W 5PF
Registered in England, Number 4356154
|